Level Lift raised this character home in Fairfield so its old foundation could be replaced with a new, full-height one. Mavericks engineered both halves of the job: the temporary shoring that holds the house in the air, timber crib towers and steel beams laid out around the new walls, and the permanent foundation that replaces the old one.
We issued the shoring and foundation drawings in phases between late 2025 and mid-2026 as the work was sequenced, and have been on site for the footing, rebar and wall reviews as the new foundation goes in under the house.